編號 : 2018195
講員 : Representatives from CLP Power Hong Kong Limited (CLP Power)
日期 : 20/10/2018
時間 : 8:45 am – 13:30 pm
進修時間 : 3
地點 : Castle Peak Power Station and Black Point Power Station at Tuen Mun
主辦單位 : 青年組
截止日期 : 請參考備註
費用 : HK$200 for members; HK$300 for non-members (including insurance and transportation)
名額 : YSG Members; First-come-first-served (maximum quota of 45)
詳情 :

CLP Power operates a vertically integrated electricity supply business in Hong Kong and provides services to 6 million people in its supply areas. In this visit, participants will be guided by engineers from CLP Power to take a close look at the facilities within their power stations in Tuen Mun, namely Castle Peak Power Station and Black Point Power Station. The engineers will also share with the participants on the process of power generation, transmission and distribution and Mr. Eric Tsang, Property Manager of CLP Power, will briefly introduce his role as a surveyor in CLP Power.

Itinerary:
8:45 am - Gather at Kowloon Tong MTR Station
9:45 am – Tour at Castle Peak Power Station (ElectriCity)
11:15am – Tour at Black Point Power Station (Gallery and bus-trip)
13:30 pm - Dismiss at Kowloon Tong MTR Station
(The scheduled time may change so as to suit the actual conditions on the date of the visit.)

About Castle Peak Power Station and Black Point Power Station

The Castle Peak Power Station was built in the 1980s to meet the increasing electricity demand in Hong Kong and started to use coal as its primary fuel. The station consists of four 350 MW and four 677 MW generating units, together with some ancillary facilities. There is also a visitors’ centre named ElectriCity, showcasing how electricity is generated and transmitted to peoples’ homes.

Black Point Power Station is one of the world’s largest gas-fired combined-cycle power stations located near to Castle Peak Power Station. It is the first power plant in Hong Kong to use natural gas for power generation when it went into operation in 1996. The complex consists of two halls with 4 turbines in each hall, generating a capacity of 2,575 MW. In response to the government’s plan to increase the percentage of local gas generation to around 50% of the total fuel mix in 2020, CLP Power is building an additional Combined Cycle Gas Turbine (CCGT) with an advanced design at the Black Point Power Station and is expected to start operations before 2020.

備註 :

FULL (NO WALK IN AVAILABLE)

Closing date: 18 October 2018

  1. Online registration is NOT accepted for this CPD event. Please fill in the attached Declaration Form together with Standard Reservation Form for this CPD event.
  2. Coach will be arranged to pick up the participants Kowloon Tong MTR Station.
  3. While HKIS will arrange for insurance policy for the participants, members may consider taking out their own insurance policy to cover their own risks.
  4. First-come-first-served with duly completed Declaration Form, Standard Reservation Form and payment.
  5. Latecomers will NOT be picked up and will not be allowed to join the visit.